article thumbnail

Lions Floor: Slow, steady wins the race

Floor Covering News

Everything is specified and built to industry standards. every vessel that comes to Long Beach has two weeks or more of lead time to get offloaded. Lions Floor seeks to leverage product quality to its advantage. Our products have undergone testing in U.S.-based based laboratories,” Guo said. Right here in the U.S.,

article thumbnail

Building with Structural Insulated Panels. or SIPs | Life of an Architect

Life of an Architect

Cheers, gt Patrick Anderson Having built a 16×12 outdoor studio with them in Long Beach (and having had one of the roof panels slip and land on my leg) I can attest to the weight of them. They mechanically fastened together with cam locks and attached to the sill in a standard fashion. Send to Email Address.

System 99