Waterproof: Domestic manufacturing update
Floor Covering News
APRIL 4, 2023
People were waiting nine to 10 months to get a container ship out of Asia, and it really helped people realize they need a source for U.S. El Paso, Texas; Fayette, Ala.; The plant is designed to reduce waste, improve quality control and increase production capacity to meet the growing demand for U.S.-based production.
Let's personalize your content