Remove Australia Remove Cement Remove Decking Remove Flooring
article thumbnail

Decorator On Demand: Color Palette, All Aboard

Decorator on Demand

Promenade Area Deck 6. Promenade area, deck 5. Deck 8 Lounge. It will only take them 3 weeks to do the entire ship and they are sailing to Australia with the contractors working the entire time.Isnt that cool and mind blowing too that they can get that much work done in only 3 weeks? cement pond. (1). Main Cabins.

article thumbnail

Residential Deconstruction versus Demolition | Life of an Architect

Life of an Architect

Salvaged items typically include doors, windows, cabinets, lighting and plumbing fixtures, framing lumber, roofing materials, and flooring. I haven’t come across that issue but once and it was the adhesive that was used to secure the linoleum to the sub-deck. So what are the advantages to deconstruction?

LEED 94