Remove Adhesive Remove Sales Remove Standards Remove Study
article thumbnail

Moisture testing on site is key

Floor Covering News

Trapped underneath the waterproof floor, the moisture is left to interact with flooring adhesives and/or the finished floor itself. If the moisture is substantial, a flooring failure such as cupping, debond­ing of glue or adhesives, mold, mildew and other issues could be the inevitable and disastrous result.

article thumbnail

Managing moisture is priority No. 1

Floor Covering News

Study the EPA’s recommendations. Opt for high-strength, solvent-free, pressure-sensitive adhesive that can handle high moisture applications without emitting any measurable VOCs. And always check installation standards. Following are four key principles to follow to avoid costly moisture mistakes. Ensure proper application.